A195-2008

Standard Form of Agreement Between Owner and Contractor for Integrated Project Delivery

$24.99 - each

Purpose: Integrated Project Delivery is a project delivery approach that integrates people, systems, business structures and practices into a process that collaboratively harnesses the talents and insights of all participants to reduce waste and optimize efficiency through all phases of design, fabrication and construction. AIA Document A195-2008 is a standard form of agreement between Owner and Architect for Integrated Project Delivery.

A195-2008 primarily provides the terms and conditions that will govern the Agreement, A195-2008 does not include a specific scope of the Contractor's services, rather it references AIA Documents A295-2008, General Conditions of the Contract for Integrated Project Delivery, which sets forth the Contractor's scope of Services. A195-2008 is intended for use on a project where the basis for payment is the Cost of the Work plus a fee where a guaranteed maximum price (which consists of the Cost of the Work plus the Contractor's Fee) is provided. A195-2008 is not intended for use in competitive bidding.

Related Documents: A195-2008 is intended for use in conjunction with A295-2008, which it incorporates by reference. A295-2008 integrates the duties and services of the Owner, Architect, and Contractor through each phase of Integrated Project Delivery. A295-2008 describes the services and duties of the Owner, Contractor and Architect in six phases: Conceptualization; Criteria Design; Detailed Design; Implementation Documents; Construction; and Closeout. Before transmitting Instruments of Service or other information in digital form, parties should establish protocols for that transmission and may use E201-2007, Digital Data Protocol Exhibit, for that purpose.

Cart

0 items in cart
Total:
$0.00